TOC Denver Commercial Electrical Power Reconfiguration

The Electricians reconfigured existing electrical infrastructure at TOC Denver to support new simulator equipment in the T1 Simulator Room and the T2 Multi-Purpose Room. Rather than installing a new system, our electricians traced, verified, separated, and reworked existing circuitry inside a raised floor system while keeping downstream devices energized.

2 Rooms ReconfiguredRaised Floor SystemsDedicated Simulator CircuitsDenver, Colorado
2 Rooms
Reconfigured for Simulator Power
10,000+ SF
Commercial Facility
Raised Floor
Existing Boxes Reused
Denver
Colorado

Project Overview

What is commercial electrical power reconfiguration? Commercial electrical power reconfiguration is the modification of existing circuitry to serve a new use, rather than the installation of a new electrical system. It involves tracing what each circuit feeds, verifying where it originates, separating and rerouting conductors, and keeping the equipment that must stay energized in service throughout. The Electricians performs this work for facility managers, general contractors, and property owners throughout the Denver metro area and the Front Range.

At TOC Denver, The Electricians modified the existing electrical infrastructure to support simulator equipment in the T1 Simulator Room and the T2 Multi-Purpose Room. The facility uses a raised floor system, so the reconfiguration happened inside infrastructure that was already in place and already serving live loads.

The result was dedicated, properly configured power for the new simulator requirements with minimal disruption to the surrounding electrical systems and no unnecessary replacement of usable infrastructure.

Project Snapshot

ClientTOC Denver
MarketCommercial Renovation and Reconfiguration
LocationDenver, Colorado
Facility Size10,000+ square feet
AreasT1 Simulator Room, T2 Multi-Purpose Room
DeliveryReconfiguration of existing systems

Scope: Circuit tracing and field verification, dedicated simulator circuits, raised floor electrical rework, new breakers and conductors, circuit separation and splicing, and testing, labeling, and verification.

Our Scope of Work

This project was diagnostic before it was installation. Every modification followed field verification of what the existing circuits actually served.

Circuit Tracing and Verification

Existing floor box and receptacle circuits traced and verified to establish how the system was configured before any modification began.

Dedicated Simulator Circuits

Dedicated circuits created to serve the new simulator equipment in both the T1 and T2 rooms.

Raised Floor Electrical Rework

Modifications made inside the existing raised floor system, with existing floor boxes reused wherever possible.

New Breakers and Conductors

A new dedicated circuit run from Panel L3 to the existing floor box location, including breaker, conductors, and terminations.

Circuit Separation and Splicing

Two circuit runs reworked, with existing circuitry separated, spliced, and reconnected to build the required configuration.

Testing, Labeling, and Verification

Downstream devices verified as energized throughout, with final labeling and testing at closeout.

Scope by Area and System

The table below summarizes what was traced, modified, retained, and installed across the two rooms.

Area or System Work Performed
T1 Simulator Room Existing floor box and receptacle circuits traced and verified
T1 floor box, shared circuit Disconnected and abandoned
T1 floor box, retained Maintained and placed on the appropriate dedicated circuit
New dedicated circuit Run from Panel L3 to the existing floor box location
Breaker and conductors New breaker, conductors, terminations, and labeling
T2 Multi-Purpose Room Existing receptacle and floor box circuitry traced
T2 circuit runs Two runs reworked, separated, spliced, and reconnected
Raised floor boxes Existing boxes reused wherever possible
Downstream devices Verified and kept energized through the reconfiguration
Closeout Final labeling, testing, and verification

T1 Simulator Room

Work in the T1 Simulator Room began with tracing and verifying the existing floor box and receptacle circuits to establish how the electrical system was actually configured. Drawings tell you what was intended. Tracing tells you what is there.

One existing floor box was found sharing a circuit with another floor box. That box was disconnected and abandoned, while the other was maintained and placed on the appropriate dedicated circuit.

The Electricians then ran a new dedicated circuit from Panel L3 to the existing floor box location, including the breaker, conductors, terminations, labeling, and final testing. Existing wall receptacles and downstream devices were verified throughout so necessary power stayed active as circuits were separated.

T2 Multi-Purpose Room

The T2 Multi-Purpose Room required additional modifications to the existing raised floor electrical infrastructure. Our electricians traced the existing receptacle and floor box circuitry before reworking the system to create the required dedicated simulator circuits.

The scope included reworking two circuit runs, then separating, splicing, and reconnecting existing circuitry as the new configuration required. Maintaining continuity to downstream receptacles received particular attention throughout that process.

Existing raised floor boxes were reused wherever possible. That kept the modification targeted and avoided replacing infrastructure that was already serving its purpose.

Working Inside Existing Electrical Systems

Commercial electrical renovation calls for a different skill set than ground up construction. On a new build the electrician creates the system. On a renovation the electrician has to understand a system somebody else created, often years earlier and not always as drawn.

What is circuit tracing? Circuit tracing is the field process of determining what a circuit serves, where it originates, what equipment sits downstream, and how a change would affect the rest of the facility. It happens before anything is disconnected.

At TOC Denver our team performed that field verification first, then separated and rerouted circuits while preserving service to devices that had to remain operational. The approach adapted the existing infrastructure to a new requirement while minimizing construction and disruption.

Raised Floor Electrical Systems

What is a raised floor electrical system? A raised floor sits above the structural slab on pedestals, creating an accessible plenum underneath where power, data, and cooling distribution run. Removable floor tiles allow equipment locations to be changed without opening walls or ceilings.

Facilities use raised floors precisely because layouts change. Simulators, workstations, and equipment move, and the electrical infrastructure has to move with them without triggering demolition.

Realizing that flexibility still requires disciplined work. Boxes have to be traced, circuits separated cleanly, and the whole system relabeled accurately, or the next contractor to open the floor inherits a puzzle instead of a system.

Project Photos

Field photography from the TOC Denver electrical reconfiguration in Denver, Colorado.

TOC Denver commercial facility where The Electricians reconfigured simulator power
Raised floor electrical work underway at the TOC Denver project
Existing circuitry traced and verified at the TOC Denver facility
Floor box and receptacle rework in the TOC Denver simulator rooms
Conductor terminations for a new dedicated simulator circuit at TOC Denver
Completed dedicated circuit installation at the TOC Denver facility

Commercial Electrical Capabilities in Colorado

Not every commercial project requires a new service or a complete buildout. The Electricians works with general contractors, facility managers, property owners, and commercial construction teams on targeted electrical modifications as well as full installations throughout Colorado.

A Family Owned Electrical Contractor

The Electricians is a family owned, licensed electrical contractor based in Centennial, Colorado. We are not owned by a private equity group. When you hire our commercial division, you work directly with the people who run the company, and decisions about your project get made here in Colorado rather than at a corporate office in another state.

Park MeadowsKeyBankVA HospitalBellco Credit UnionCDOTFloor & DecorWalmartChipotleAt HomeQuikTripPandora
CO Lic. #EC.0101962 · 2M GL · 5M Umbrella · Bonded · Insured · BBB A+ · Tesla Certified · SPAN Authorized · Generac Authorized

Commercial Electrical Modification FAQs

Common questions from facility managers, general contractors, and property owners planning an electrical modification in Colorado.

The Electricians completed the commercial electrical power reconfiguration at TOC Denver, modifying existing infrastructure to support simulator equipment in the T1 Simulator Room and the T2 Multi-Purpose Room. The work included circuit tracing and verification, a new dedicated circuit from Panel L3, reworking two circuit runs, raised floor modifications, and final labeling and testing.
Commercial electrical power reconfiguration is the modification of existing circuitry to serve a new use rather than the installation of a new system. It involves tracing what each circuit feeds, verifying where it originates, separating and rerouting conductors, and keeping equipment that must stay energized in service throughout. The Electricians performs this work throughout the Denver metro area and the Front Range.
Circuit tracing is the field process of determining what a circuit serves, where it originates, what equipment sits downstream, and how a change would affect the rest of the facility. It happens before anything is disconnected because existing systems are frequently not configured the way the drawings show, and modifying an untraced circuit risks taking equipment offline that has to stay running.
A raised floor sits above the structural slab on pedestals, creating an accessible plenum underneath where power, data, and cooling distribution run. Removable floor tiles let equipment locations change without opening walls or ceilings. Facilities that expect layouts to move, including simulator rooms, training centers, and data centers, use raised floors for that flexibility.
A dedicated circuit serves one load and nothing else. That keeps sensitive equipment off shared circuits where other loads can introduce disturbances, and it prevents an unrelated device from tripping a breaker that takes the equipment offline. For simulators and similar equipment, dedicated power is typically a manufacturer requirement rather than a preference.
Yes. Not every commercial project requires a new service or a complete buildout. The Electricians handles targeted modifications including dedicated equipment circuits, power reconfiguration, circuit tracing, and panel changes, as well as larger tenant improvements and full commercial installations across Colorado.
Submit the request form on this page or call our office. Describe the equipment being added or the space being reconfigured, send any available drawings or panel schedules, and include your schedule. Our commercial estimating team will review the scope and respond with a proposal.

Planning a Commercial Electrical Project?

Whether you are adding specialized equipment, renovating an existing space, or reconfiguring electrical infrastructure for a new use, The Electricians can determine the most effective way to adapt the existing system.

Send us the equipment requirements, any available drawings or panel schedules, and your schedule. Our commercial estimating team will respond with a proposal and add The Electricians to your bidders list.

Call 720-303-0150
Upfront written pricing. Licensed, bonded, and insured. CO Lic. #EC.0101962.

No Cost Consultation
Licensed & Insured
★★★★★
4.9 · 350+ Reviews · BBB A+
⏱ Takes 30 seconds - we'll reach out to confirm your appointment.
Service Address (optional - we'll confirm on the call)
Pick a Date